From: route@monster.com
Sent: Friday, April 15, 2016 10:21 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Michael K. Jackson Wichita KS 67226 Home: (316)425-3323 Afghanistan cell: 011 9379 814 8332 mkjackson24@hotmail.com Current clearance
status: Active, Expires 20JUN18 Attended CRC:
March/April 2009 Passport expiry:
02Feb18 EXPERIENCE Oct
2012-present SERCO-NA-
Electronics Technician II -
Provide E&I support to the 335th
Signal Command at Kandahar Air Field -
Decommission/Recovery of Tech Control Facilities
buildings and comm. equipment at closing FOBs as needed; to include:
de-install of fuel tanks, generators and power cables, prep and removal of
communication equipment shelters, breakdown of I-beam support structures,
inventory of communication hardware, container packing of all equipment and
prep for shipping. -
Act as Temporary Site Lead during supervisors
absence -
Installed multiple 144 and 12 strand fibers, as
well as 300pr and 25pr Copper for major project on KAF, and terminated in 20+
buildings -
Troubleshooting and repair of faulty circuits as
needed -
Survey and pre-engineer material and installation
requirements, to include manhole butterflies, duct inspection, cable and
hardware requirements and timeframe estimations for upcoming communication
installation projects -
Familiar with operation of SkyTrak MMV and JCB
550 forklifts May
2011- Sept 2012 Centurum,
Inc- ISP/OSP Cable Technician II -
Deployed to Kandahar, Afghanistan to Kandahar Air
Base to support the Army 335th Signal Command -
Install, terminate, splice and test multi-strand
OSP/ISP Optical Fiber -
Install OSP Infrastructure to include trenching
and MH/HH pits with backhoe or trencher, installation of manholes/hand-holes,
placement of conduit duct systems, rod and rope, and placement of Maxcell -
Testing and certification of Copper and Fiber
cabling -
Equipment operator as job requires -
Acted as Lead Tech -
Insure installations meet I3A standards for QA/QC
acceptance Mar
09 – May 2011 ITT
Systems - ISP/OSP Cable Technician II -
Deployed to Kandahar, Afghanistan to Kandahar Air
Base to support the Air Force 451st AEW -
Install OSP Infrastructure (trenching, conduit
placement, hand-holes, etc.) throughout the base -
Install, terminate, splice and test multi-strand
OSP/ISP Backbone/Horizontal Fiber Optic and copper cable and associated
housings and equipment in/on Comm. room, MDF and ITN equipment racks,
backboards and cabinets -
Install, terminate and test ISP premise wiring -
Utilize Fujikura splicers, Fluke cable analyzers,
Anritsu OTDR -
Install grounding (rods, wire, clamps) and tested
to base specs. -
Familiar with JCB 3CX/4CX and Terex backhoes,
Ditch Witch trenchers, skid-steer (Bobcat and JCB) loaders, Int’l Cable reel
truck -
Acted as Interim Site Lead while site lead was
out of AOR May
08-Mar 09 ITT
Corporation- Systems Division- Inside/Outside
Cable Plant Technician II -
Deployed to Doha, Qatar at Al Udeid Air Base to
install, terminate and test the fiber and copper infrastructure of the new
Combined Air Operations Center -
Installed under floor cable tray, floor boxes and
equipment cabinets through-out building -
Performed optical fiber splicing of patch cables
to horizontal fiber cables at floor boxes -
Performed troubleshooting of cables post testing
to correct any faults identified where needed Jan
07 – Apr 08 BCS/Condor
Technology – Project Manager, International Department -
Deployed to Balad, Iraq for 9 months to
lead an Outside Plant fiber optic project -
Ensure crew had the necessary materials in order
to complete their tasks -
Lead 2 crew supervisors and 11 technicians to
ensure they perform duties safely -
Submit material requests, prepare timesheets,
disburse per diem, turn in daily reports to both our Bahrain office and to
the prime contractor on site, as well as put together deliverable packages at
the completion of milestones for the Army’s acceptance, and ensure that the
installation is up to I3MP standards -
Deployed to Camp Buehring, Kuwait to install DCME
equipment in a new Communications
building and assisted start-up of a copper and fiber installation Oct
06 – Dec 06 MCS
of Tampa, McConnell AFB KS
– Telephone Mechanic -
Scheduled and completed work orders to meet
contact requirements -
Placed and terminated Cat 5 voice and data
cabling in buildings throughout the base, as well as the installation of
termination blocks and patch panels -
Troubleshot and corrected phone issues and
outages -
Interacted with TCOs and POCs--ensured projects
were satisfactorily completed May
01 – Sep 06 MTS,
Inc., McConnell AFB KS – Telephone
Mechanic -
Provided assistance to the Air Force
Communications Squadron on large project updates -
Replaced 300 telephones at base clinic and moved
various agencies throughout the base to accommodate building remodels -
Terminated, tested and connected LAN cabling and
installed LAN equipment -
Performed duties as Alternate Site Manager and
Switch Tech Mar
98 – Apr 2001 ProTel,
Inc., - Nortel Switch Installation Specialist -
Installed Nortel Central Office and Remote switch
equipment; such as SL-100, DMS -100, SNSEs, MCLMs, MCAMs, MCME’s and
other peripheral equipment, including Access Nodes, power equipment,
rectifiers, inverters, battery back-ups DSX panels and associated cabling
requirements -
Installations were in support of Y2K fiber
upgrades and performed at a number of military bases throughout the United
States, including Travis AFB, Vandenberg AFB, Fort Leonard Wood, Fort Sam
Houston, Hunter Army Air Field, Laughlin AFB, and Yuma MCAS, as well as
overseas in Okinawa (Kadena AFB), Qatar, Saudi Arabia and just over one year
in Bahrain working at NSA Bahrain -
While in Bahrain I was introduced to SL-100
programming and troubleshooting of phones and line cards -
I am familiar with working with blueprints for
the placement of equipment, installing cable trays, ladder rack and running
DC wiring -
Other duties have involved cable audits,
cut-overs and premise wiring for voice and LAN applications Sept
97 – Feb 98 Aerotek,
Inc., Voice and Data Technician -
Installed voice, data cabling and optical fiber
throughout California -
Assisted with communications and data network
rebuild in a building in Sacramento, California May
91 – Jul 97 Office
Network Technologies – Project
Manager -
Managed local projects as well as handled a
nationwide account that included traveling to various states to oversee the
telephone and data cable installation in new corporate offices for a major
financial institution -
Managed and worked with teams ranging from 2-6
technicians -
Coordinated with customers and suppliers in order
to complete projects on time EDUCATION and TRAINING 1998:
Nortel Power Systems Certification
Raleigh, North Carolina 2004: Nortel Networks Meridian 1 Large Systems
Maintenance- Communication Server 1000 Release 4.0 Certificate of
Completion Richardson, Texas I
have used basic Nortel Meridian 1 Option 81c and Option 11 commands in the
programming, changing, moving and removing of digital/analog phones, changing
switch access passwords, line card replacement, disabling/re-enabling super
loops and trunks, along with troubleshooting connections between the 81c and
11c Hotel switch, and acting as back-up to the base switch technician 1979:
John F. Kennedy Sr. High School, Sacramento CA.,
Diploma 1979-1981: Sacramento City College (53 units towards
AA degree) Community Involvement Member
of Sedgwick County Community Emergency Response Team (CERT) K9
Search and Rescue Handler/Trainer Certified
Search and Rescue Tech II (NASAR) |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|